On schedule to get the roof re-instated

The Girders supporting the new mezzanine floor and principal roof struts have been installed. It was all hand to the pumps lifting the girders in place as it was not possible to get a crane to do the lifting owing to the confined space.

As the floor had to be laid before the re-instatement of the roof it is a worrying time as the floor is water resistant to a point but prolonged rain could ruin it.

Main roof struts in place.View along the length of the roof struts.Oh no Storm Clouds.This picture clearly shows repairs made to the walls.Timbers supporting the floor and temporary floor covering.Some work is still required on the upper walls.A roof strut before the steel support plate is fitted.Until the stairs are in this ladder is the only way to reach the upper floor.
Top of Page
This website is W3C XHTML validatedThis website is W3C CSS validated

This web site was created by CompugraF Web Page Designers © CompugraF 2008-2017
This web site, including text, artwork and photos © Gorleston History 2008-2017